Single chain trimers and uses therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8518697
SERIAL NO

12691489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Single chain trimer (SCT) molecules are disclosed, comprising an MHC antigen peptide sequence, a β2-microglobulin sequence and a full-length MHC class I heavy chain sequence, joined by linker sequences. Further described are nucleic acids encoding single chain trimers. Methods for expansion of antigen-specific T cell populations using single chain trimer molecules are also disclosed. In some configurations, these methods comprise co-culturing, in a first stage, CD8+ T cells from a donor with antigen presenting cells comprising an MHC antigen peptide, and co-culturing, in a second stage, the CD8+ T cells with cells comprising an SCT which has an MHC antigen peptide sequence identical to the sequence of the antigen peptide in the first stage. The methods can provide 10,000-100,000 fold expansion of antigen-specific CD8+ T cells within about 28 days after establishing culture, and can yield over 1 billion antigen-specific CD8+ T cells expanded from an individual donor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNIVERSITY OF WASHINGTON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becker-Hapak, Michelle St. Louis, US 2 65
Hansen, Ted St. Louis, US 4 72
Linette, Gerald St. Louis, US 3 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00