Articulating linear high bay light fixture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11408599
SERIAL NO

17466428

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light fixture includes a central housing, a panel, a light source, and a tether. The central housing defines first and second side surfaces and a bottom surface, and the bottom surface defines a plane. The panel is pivotably coupled with the first side surface, and the light source is coupled with the panel. The tether is coupled at one end with the panel to pivotably suspend the panel, and the second end of the tether includes an attachment member. The attachment member is configured to selectively couple with any one of a plurality of anchor positions located on the central housing. The panel is therefore fixable between a plurality of angles relative to the plane as determined by the attachment member being coupled with a selected one of the plurality of anchor positions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RAB LIGHTING INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calaceto, Nicholas Paramus, US 12 26
Milberger, Timothy Sacramento, US 2 37
On, Peter Houston, US 20 143
Oross, Glen San Diego, US 24 253

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 9, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 9, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00