Methods and apparatus for flow control associated with a switch fabric

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11711319
APP PUB NO 20200195587A1
SERIAL NO

16801931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In some embodiments, an apparatus includes a flow control module configured to receive a first data packet from an output queue of a stage of a multi-stage switch at a first rate when an available capacity of the output queue crosses a first threshold. The flow control module is configured to receive a second data packet from the output queue of the stage of the multi-stage switch at a second rate when the available capacity of the output queue crosses a second threshold. The flow control module configured to send a flow control signal to an edge device of the multi-stage switch from which the first data packet or the second data packet entered the multi-stage switch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JUNIPER NETWORKS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anand, Prashant Noida, IN 54 1701
Aybay, Gunes Cupertino, US 112 3091
Bhalala, Hardik Fremont, US 5 227
Sarcar, Arijit San Jose, US 7 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00