Vehicle body structure, reinforcement member, and reinforcement member manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11919573
APP PUB NO 20220289296A1
SERIAL NO

17827248

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle body structure includes a support member of a vehicle body, and a reinforcement member disposed along a longitudinal direction of the support member of the vehicle body to reinforce the support member of the vehicle body. The reinforcement member is a processed product formed by shaping a tubular body, and includes a flange portion that protrudes on an outer peripheral portion and that is formed in the longitudinal direction of the support member of the vehicle body. The flange portion is joined to the support member of the vehicle body at a location other than locations where the support member of the vehicle body is joined to other members different from the reinforcement member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO HEAVY INDUSTRIES LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishizuka, Masayuki Ehime, JP 61 164
Komatsu, Takashi Tochigi, JP 73 462
Shimizu, Satoshi Ehime, JP 329 3095

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00