Hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11260742
APP PUB NO 20200070809A1
SERIAL NO

16117459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One axle of a hybrid vehicle is powered by an electric motor while a second axle of the vehicle is powered by a powertrain that includes an internal combustion engine. The electrically driven axle can be controlled in a speed control mode or in a torque control mode based on a driver demanded torque. The speed control mode is used when slip is detected at the electrically driven axle. The torque control mode is used when the electrically driven axle has traction. During a transition between these modes, the rate of change of torque is controlled to a predetermined level to mitigate noise, vibration, and harshness.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FORD GLOBAL TECHNOLOGIES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alcantar, Jose Velazquez Canton, US 5 24
Barrette, Peter James Jupiter, US 7 19
Bruns, Richard David Milford, US 5 7
Johri, Rajit Canton, US 165 2093
Stout, Corwin Ann Arbor, US 6 14
Torres, Joe Jay Dearborn, US 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 1, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 1, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00