Nucleic acid constructs, plants with increased tuber yield, and methods for increasing tuber yield in a plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11795468
APP PUB NO 20190218565A1
SERIAL NO

16246321

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a nucleic acid construct. The nucleic acid construct includes a nucleic acid molecule configured to silence or reduce the expression of StBEL11 and/or StBEL29 and variants thereof, a 5′ DNA promoter sequence, and a 3′ terminator sequence, where the first nucleic acid molecule, the promoter sequence, and the terminator sequence are operatively coupled to permit transcription of the first nucleic acid molecule. The present invention is also directed to vectors, host cells, transgenic plants, and transgenic plant seeds, as well as non-transgenic mutant plants, and methods for altering tuber yield in a plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IOWA STATE UNIVERSITY RESEARCH FOUNDATION, INC.; INDIAN INSTITUTE OF SCIENCE EDUCATION AND RESEARCH (IISER)

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Banerjee, Anjan K Pune, IN 3 3
Hannapel, David J Ames, US 5 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00