Channelization for uplink transmissions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11659556
APP PUB NO 20210352659A1
SERIAL NO

17384509

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of wireless communication may include transmitting an uplink slot with a first control region, a second control region, and (e.g., optionally) a data region. Each region may include time resources and frequency resources. Transmitting the uplink slot may include transmitting the first control region in an earlier part of the uplink slot and transmitting the second control region (e.g., and the data region) in a later part of the uplink slot. The first control region may include time-critical control information and the second control region may include non-time-critical control information. A receiver receiving the uplink slot may receive the first control region before receiving the data region and the second control region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akkarakaran, Sony Poway, US 1158 3767
Fan, Zhifei San Diego, US 184 1008
Luo, Tao San Diego, US 5073 29474
Montojo, Juan San Diego, US 1398 24609
Zhang, Xiaoxia San Diego, US 2445 11244

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00