SSB, coreset, SIB signal block for initial access information

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11924862
APP PUB NO 20220361178A1
SERIAL NO

17236806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A base station may transmit, to a UE, at least one of the SS, the PBCH, the CORESET, or the SIB, via the plurality of resources based on the indication of the at least one initial access structure. In some aspects, the SS may be time-division multiplexed with the PBCH and may be frequency-division multiplexed with the CORESET and the SIB. In one aspect, the CORESET may be time-division multiplexed with the SIB. In another aspect, the CORESET may be frequency-division multiplexed with the SIB. In some aspects, at least one switching gap may be configured after the at least one initial access structure, the at least one switching gap being configured based on an SCS.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Luo, Tao San Diego, US 5019 29168
Montojo, Juan San Diego, US 1392 24485
Sakhnini, Iyab Issam San Diego, US 358 239
Sun, Jing San Diego, US 2168 9412
Zhang, Xiaoxia San Diego, US 2420 11063

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00