Bus terminal for automation system and method for monitoring a current-supply network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11187733
APP PUB NO 20200132738A1
SERIAL NO

16725517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Measuring data are provided for monitoring a current-supply network, based on one or a plurality of measured electrical quantities of the current-supply network. A time signal is assigned to the measuring data. The measuring data are inspected for the occurrence of one a plurality of predetermined events. Based on determining the occurrence of predetermined event or events, corresponding event data based on the measuring data are generated. A time stamp is conferred to the event data, where the time stamp is based on a link of a synchronized clock time provided by a clock and the time signal assigned to the measuring data. User data are generated from the event data comprising the time stamp, and transmitted via a communication network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BECKHOFF AUTOMATION GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Assion, Fabian Bielefeld, DE 2 0
Ens, Jakob Harsewinkel, DE 2 0
Lienen, Christian Delbrück, DE 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00