Integrated battery charge regulation circuit based on power FET conductivity modulation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11916426
SERIAL NO

17114081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes: a switching converter circuit adapted to be coupled between an input voltage source and a load; and an integrated circuit adapted to be coupled between the input voltage source and a battery and configured to charge the battery. The integrated circuit has: a monitoring circuitry adapted to be coupled to the battery and configured to detect a transient fault condition of the integrated circuit; a power stage adapted to be coupled between the input voltage source and the battery, the power stage having a power switch; and a control circuit coupled between the monitoring circuitry and the power stage, the control circuit configured to provide a control signal to adjust a conductivity of the power switch responsive to a detected transient fault condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AGILENT TECHNOLOGIES TEXAS INSTRUMENTS INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oner, Hakan San Jose, US 10 47
Scoones, Kevin San Jose, US 39 674

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00