Valve assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11746915
SERIAL NO

17600006

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a valve assembly, comprising a valve body, in which a fluid channel is formed that connects a fluid inlet to a fluid outlet, wherein a preload force is applied to a closing body, which is movably mounted in the fluid channel, in the direction of a valve seat formed in the valve body, a fluid force acting on the closing body against the preload force in order to open the valve seat. The closing body is guided axially and/or radially by at least one guide ball, the guide ball being arranged between the closing body and a lateral boundary of the fluid channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBH70442 STUTTGART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biehler, Marcus Wuestenrot, DE 3 3
Eisele, Christoph Heilbronn, DE 9 8
Gardt, Andrej Abstatt, DE 13 12
Kloss, Michael Ilsfeld-Auenstein, DE 5 115
Kreutzer, Joern Duelmen, DE 3 2
Lechler, Andreas Moeglingen, DE 13 12
Schellnegger, Patrick Ludwigsburg, DE 13 10
Schorn, Felix Renningen, DE 8 2
Stahr, Wolf Abstatt, DE 17 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00