Abrasive media blasting method and apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11267101
APP PUB NO 20190134780A1
SERIAL NO

15989557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An improved media blasting system that separates the fluid velocity development, the introduction of media and the acceleration of media from each other. The preferred arrangement has a supersonic nozzle that produces supersonic velocity air discharged into a coupled acceleration chamber. No shot travels within the supersonic nozzle, so no wear of the supersonic nozzle interior occurs, thus making the nozzle shorter, of plain metal alloys, less expensive to manufacture and lasting indefinitely. The shot is separately introduced into the acceleration chamber thus avoiding it's otherwise limitation to the air mass flow rate in the air supply hose or pipe. Thus the average velocity used to transfer momentum to the shot is much higher than the lower average velocity currently available within other blasting nozzles, which occurs from throat to exit. Further, the nozzle design parameters are selected to match the higher maximum power output of a selected air compressor and are not constrained by nozzle wear factors requiring frequent replacement of the nozzle for reasons of nozzle wear.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARBORJET INC99 BLUEBERRY HILL ROAD WOBURN MA 01801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hursen, Thomas Francis Glenshaw, US 8 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00