Apparatuses and methods involving power conversion using multiple rectifier circuits

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11228252
APP PUB NO 20210075333A1
SERIAL NO

16977986

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus including direct-current (DC)-alternating-current (AC) inverter circuitry, first and second circuits, and output circuitry. The DC-AC inverter circuitry inverts a DC input signal corresponding to an input voltage to an AC signal. The first circuit and second circuits respectively include inductive isolation circuits driven in response to power from the at least one AC signal, and rectifier circuits that responds to the inductive isolation circuits by outputting first and second rectified signals, where at least one of the first and second rectifier circuits characterized as being limited by a voltage breakdown rating. The output circuitry provides a DC output voltage signal and to cascade a plurality of signals, including the first and second rectified signals, to provide a voltage source that is dependent on the first and second rectified signals and greater than voltage breakdown rating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE BOARD OF TRUSTEES OF THE LELAND STANFORD JUNIOR UNIVERSITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Lei Stanford, US 74 723
Park, Sanghyeon Stanford, US 9 99
Raymond, Luke C Redwood City, US 8 12
Rivas-Davila, Juan M Palo Alto, US 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 18, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 18, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 18, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00