Coordinated access point channelization for transmission opportunity sharing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11716632
APP PUB NO 20220394487A1
SERIAL NO

17336834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Coordinated Frequency Division Multiplexing (FDM) Transmission Opportunity (TXOP) sharing may be provided by determining that at least two Access Points (APs) of a wireless network support coordinated FDM TXOP sharing. In response to the determination that the at least two APs support coordinated FDM TXOP sharing, at least one of: a first bias is applied to a channel assignment algorithm to promote an assignment of overlapping channels of the at least two APs, and a second bias is applied to the channel assignment algorithm to promote an assignment of adjacent channels of the at least two APs. Next, channels are assigned to the at least two APs based on an output of the channel assignment algorithm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CISCO TECHNOLOGY INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cizdziel, Benjamin Jacob San Jose, US 23 43
Desai, Vishal Satyendra San Jose, US 83 247
Kulkarni, Santosh Babaji San Jose, US 25 46
Monajemi, Pooya Irvine, US 115 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 1, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00