Smart fuel supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11859564
APP PUB NO 20230265800A1
SERIAL NO

17719060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel supply system includes a pump to be connected to a fuel tank. A metering valve is downstream of the pump. A control is programmed to control at least one of the pump and metering valve. The control is operable to take in a flow demand signal and a fuel pressure signal from a controller associated with a gas turbine engine. The flow demand signal is indicative of a desired flow volume and the fuel pressure signal is indicative of a desired fuel pressure. Operation conditions are identified for the at least one of said pump and the metering valve. A gas turbine engine and fuel supply system is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATIONFOUR COLISEUM CENTRE 2730 WEST TYVOLA ROAD CHARLOTTE NC 28217-4578

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goy, Edward W Crystal Lake, US 27 4
Harder, Benjamin T Sycamore, US 17 32
Shook, Ryan Loves Park, US 14 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00