Connection structure and method of forming the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10833002
APP PUB NO 20200185314A1
SERIAL NO

16447441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a connection structure for a semiconductor package which includes: a first passivation layer having an opening; a first conductive pattern that penetrates the first passivation layer and protrudes upwardly from the first passivation layer; a second passivation layer on the first passivation layer and covering the first conductive pattern; a second conductive pattern on the second passivation layer and electrically connected to the first conductive pattern; a third passivation layer on the second passivation layer and covering the second conductive pattern; and an external terminal in the opening and electrically connected to the first conductive pattern, wherein the first conductive pattern is thicker than the second conductive pattern.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jongyoun Seoul, KR 44 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 10, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 May 10, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00