Solid-state imaging apparatus and imaging apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11910108
APP PUB NO 20230141384A1
SERIAL NO

18153488

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Time deviation between event detection and gradation acquisition is reduced. A solid-state imaging apparatus according to an embodiment includes: a pixel array unit (300) including a plurality of pixel blocks (310) arrayed in a matrix; and a drive circuit (211) that generates a pixel signal in a first pixel block in which firing of an address event has been detected among the plurality of pixel blocks, each of the plurality of pixel blocks including a first photoelectric conversion element (331) that generates an electric charge according to an amount of incident light, a detection unit (400) that detects the firing of the address event based on the electric charge generated in the first photoelectric conversion element, a second photoelectric conversion element (321) that generates an electric charge according to an amount of incident light, and a pixel circuit (322, 323, 324, 325, 326) that generates a pixel signal based on the electric charge generated in the second photoelectric conversion element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SONY SEMICONDUCTOR SOLUTIONS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honda, Motonari Kanagawa, JP 19 63
Niwa, Atsumi Kanagawa, JP 53 158

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00