Methods and apparatus for FEC rate adaptation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11509420
SERIAL NO

17064572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to methods and devices for graphics or data processing including an apparatus, e.g., a network, a server, or a client device. In some aspects, the apparatus may transmit a request for an updated FEC rate, the updated FEC rate being based on a previous FEC rate. The apparatus may also receive, based on the request for the updated FEC rate, information associated with the updated FEC rate. Additionally, the apparatus may determine the updated FEC rate based on the received information, the received information being associated with a difference between the previous FEC rate and the updated FEC rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Agarwal, Ravi San Diego, US 134 848
Hande, Prashanth Haridas San Diego, US 121 134
Lin, Yih-Hao San Diego, US 73 494
Sampath, Hemanth San Diego, US 429 11310
Tinnakornsrisuphap, Peerapol San Diego, US 282 5191

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 22, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00