Building management system with equipment schedule and setpoint synchronization and control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11435709
APP PUB NO 20200379421A1
SERIAL NO

16805117

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A building management system comprises building equipment operable to affect a physical state or condition of a building. The building management system includes a system manager coupled to the building equipment via a system bus, the system manager comprising a schedule manager configured to control a first operation schedule of the building equipment. Combined schedules are configured to be controlled by the schedule manager. The combined schedules are configured to control both a first setpoint of the building equipment and first operation schedule of the building equipment. A client device is configured to communicate with the schedule manager to modify the first operation schedule of the building equipment to include the first schedule object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOHNSON CONTROLS TYCO IP HOLDINGS LLP5757 NORTH GREEN BAY AVENUE MILWAUKEE WI 53209

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fischbach, Mark T Milwaukee, US 13 19
Gupta, Vivek V Shorewood, US 26 184

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00