Resin composition and article made therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11572469
APP PUB NO 20220372284A1
SERIAL NO

17339566

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resin composition includes 100 parts by weight of a vinyl-containing polyphenylene ether resin; 2 parts by weight to 50 parts by weight of any compound having a structure of Formula (1) or a combination thereof; and 20 parts by weight to 80 parts by weight of a polyolefin resin; the polyolefin resin includes styrene-butadiene-divinylbenzene terpolymer, styrene-butadiene-maleic anhydride terpolymer, styrene-butadiene copolymer, hydrogenated styrene-butadiene copolymer, polybutadiene, maleic anhydride-butadiene copolymer or a combination thereof. Moreover, an article may be made from the resin composition, including a prepreg, a resin film, a laminate or a printed circuit board.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELITE MATERIAL CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Ching-Hsien Taoyuan, TW 10 6
Liu, Tse-Hung Taoyuan, TW 3 49
Tsai, Tsan-Hung Taoyuan, TW 18 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 7, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00