Method and system for hyperspectral light field imaging

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10641658
SERIAL NO

16678104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for generating hyperspectral data-cubes based on a plurality of hyperspectral light field (H-LF) images is disclosed. Each H-LF image may have a different view and a different spectral band. The method may include calculating a magnitude histogram, a direction histogram, and an overlapping histogram of oriented gradient for a plurality of pixels; developing a spectral-invariant feature descriptor by combining the magnitude histogram, the direction histogram, and the overlapping histogram of oriented gradient; obtaining a correspondence cost of the H-LF images based on the spectral-invariable feature descriptor; performing H-LF stereo matching on the H-LF images to obtain a disparity map of a reference view; and generating hyperspectral data-cubes by using the disparity map of the reference view. A bin in the overlapping histogram of oriented gradient may comprise overlapping ranges of directions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHANGHAITECH UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yu, Jingyi Shanghai, CN 29 337

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00