Vehicle control device and vehicle control simulation device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11409252
APP PUB NO 20200103839A1
SERIAL NO

16620762

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a vehicle control device and a vehicle control simulation device that enable, even for parallel processing with a plurality of arithmetic devices, approximation in act between at verification of simulation operation on a model base and at verification of operation on an actual vehicle. Provided are: control model information for control of a system; hardware information for operation of a control model; arithmetic-device allocation information as to which arithmetic device in hardware is allocated to perform arithmetic processing to a control program in the control model; delay time information regarding a case where the control model operates on the hardware; and a delay-time adding unit configured to create delay-inclusive control model information in which the delay time information is inserted in the control model, based on at least either the arithmetic-device allocation information or the hardware information.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI ASTEMO, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Takeshi Tokyo, JP 260 2861
Iida, Takahiro Tokyo, JP 42 357
Irie, Toru Hitachinaka, JP 19 409
Suzuki, Takafumi Hitachinaka, JP 142 745

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 9, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 9, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00