Simulation method using memory frame proxy architecture for synchronization and check handling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10204195
APP PUB NO 20160162618A1
SERIAL NO

15013449

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A simulation technique that handles accesses to a frame of memory via a proxy object provides improved throughput in simulation environments. The proxy object, if present, processes the access at a head of a linked list of frames. If a check frame is not inserted in the list, the memory frame handles the request directly, but if a check frame is inserted, then the check operation is performed. The check frame can be a synchronization frame that blocks access to a memory frame while the check frame is present, or the check frame may be a breakpoint, watch or exception frame that calls a suitable handling routine. Additional check frames may be chained between the interface and the memory subsystem to handle synchronization, breakpoints, memory watches or other accesses to or information gathering associated with the memory frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bashore, Tracy Rochester, US 7 24
Gheith, Ahmed Austin, US 59 719
Kumar, Aditya Austin, US 78 973
Malota, Andrew R Austin, US 6 14
Rockhold, Ronald L Satellite Beach, US 8 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00