Auxiliary monitoring system for traction substation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11352035
SERIAL NO

17573576

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The video monitoring system collects a video data stream in real time; the device inspection system collects and uploads an image of each electrical device along a line; the voice communication system realizes a voice call between an inspection staff and a back-end monitoring staff; the environmental monitoring system monitors a temperature, a humidity, and a water intake in the traction substation and each electrical device; the fire alarm system monitors a fire in the traction substation; the sulfur hexafluoride gas monitoring system monitors a sulfur hexafluoride gas leakage in an electrical device; the security prevention system collects alarm information; the power lighting monitoring system collects operation information of a power lighting device; the power monitoring system monitors an input current and voltage and an output current and voltage of the traction substation in real time. The information is transmitted to the railroad dispatching center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EAST CHINA JIAOTONG UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Chengcheng Nanchang, CN 5 1
He, Yong Nanchang, CN 280 3396
Hu, Jun Nanchang, CN 298 1563
Lin, Tongzheng Nanchang, CN 1 0
Liu, Yande Nanchang, CN 2 0
Xu, Fan Nanchang, CN 122 455
Yu, Bin Nanchang, CN 714 18157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00