Semiconductor package with EMI shielding structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11355450
APP PUB NO 20210035919A1
SERIAL NO

16930278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor package includes a carrier substrate having a top surface; a semiconductor die mounted on the top surface; a plurality of first bonding wires connecting the semiconductor die to the carrier substrate; an insulating material encapsulating the plurality of first bonding wires; a component having a metal layer mounted on the insulating material; a plurality of second bonding wires connecting the metal layer of the component to the carrier substrate; and a molding compound covering the top surface of the carrier substrate and encapsulating the semiconductor die, the component, the plurality of first bonding wires, the plurality of second bonding wires, and the insulating material. The metal layer and the plurality of second bonding wires constitute an electromagnetic interference (EMI) shielding structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MEDIATEK INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsai, Shiann-Tsong Hsinchu, TW 32 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00