Infrastructure construction digital integrated twin (ICDIT)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11341830
APP PUB NO 20220044538A1
SERIAL NO

16987076

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure describes a computer-implemented method to manage an industrial plant facility, the method including: monitoring multiple streams of input data from a network of sensors at the industrial plant facility, wherein the network of sensors include one or more camera devices; determining, by a server computer, an event during construction or operation of the industrial plant facility based on analyzing the multiple streams of input data in real-time; and based on the determined event, generating a notification to alert at least one operator of the industrial plant facility.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Halafi, Abdullah Fayez Dammam, SA 4 3
Al-Yousef, Bander R Al Mubarraz, SA 5 3
Alkhabbaz, Fouad Qatif, SA 6 21
Almadi, Soloman M Dhahran, SA 20 646
AlSenaide, Abdulaziz Khaled Riyadh, SA 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00