Methods of controlling drill bit trajectory by predicting bit walk and wellbore spiraling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10296678
APP PUB NO 20170058658A1
SERIAL NO

15348003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of controlling drill bit trajectory in a subterranean formation includes receiving drilling parameters for operating a specific bottomhole assembly (BHA), constructing, with a computer processor, a directional drill-ahead simulator including a computer model of the BHA and the subterranean formation, calculating axial motion and lateral motion of a drill bit connected to a bottom end of the BHA using formation parameters and drilling parameters, predicting bit walk of the drill bit by accounting for and calculating contact forces and frictional forces between the BHA and a wall of a borehole in the subterranean formation using the computer model of the BHA, and determining an adjusted drill bit trajectory to account for the predicted bit walk. The method includes determining adjusted drilling parameters for operating the BHA to substantially follow the adjusted drill bit trajectory and operating the BHA according to the adjusted drilling parameters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BAKER HUGHES INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hanson, Jonathan M Salt Lake City, US 8 57
Spencer, Reed W Spring, US 23 110
Uno, Timothy P Spring, US 7 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00