High-speed real-time bus system and data processing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11469918
APP PUB NO 20200358633A1
SERIAL NO

16914272

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a high-speed real-time bus system and a data processing method thereof. Each node device forms an annularly connected topological structure by means of a high-speed real-time bus; a master node device respectively sends a bus clock signal and a data signal to a slave node device of the next grade of the master node device in the topological structure by means of a clock channel and a data channel; each slave node device receives the bus clock signal and the data signal sent from the respective node device of the previous grade, performs data processing according to the bus clock signal and the data signal so as to update the data signal and sends the bus clock signal and the updated data signal to the respective node device of the next grade.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NANOVISION TECHNOLOGY (BEIJING) CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Zhili Beijing, CN 7 9
Guo, Qingliang Beijing, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 11, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00