Additive metal manufacturing system for in-situ metrology and process control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10792756
APP PUB NO 20190047077A1
SERIAL NO

15675767

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure provides systems, methods and apparatus systems and methods described herein provide, among other things, a system for additive manufacturing of metal objects. The system includes two electron beams. In one optional implementation, one beam is high powered and acts as a deposition beam that melts a metal feed stock material which is delivered to a deposition zone and onto a work surface and the second electron beam is a low power electron source. The second electron beam acts as an interrogating source that generates an electron beam which interacts with the deposited material. The second electron beam may be active after material is deposited and provides post-deposition in-situ metrology. Various signals generated by this second beam/material interaction are collected and used to provide information about the melted and deposited material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bassett, Brian South Hampton, US 4 59
Comunale, Richard A Ipswich, US 4 33
Ivory, John E New Hartford, US 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 6, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 6, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00