3D 1T1C stacked DRAM structure and method to fabricate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11849572
APP PUB NO 20200227416A1
SERIAL NO

16247321

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments disclosed herein include three-dimensional 3D arrays of memory cells and methods of forming such devices. In an embodiment a memory device comprises, a substrate surface, and a three-dimensional (3D) array of memory cells over the substrate surface. In an embodiment each memory cell comprises a transistor and a capacitor. In an embodiment the transistor of each memory cell comprises, a semiconductor channel, with a first end of the semiconductor channel electrically coupled to a bit line that runs substantially parallel to the substrate surface, and a second end of the semiconductor channel is electrically coupled to the capacitor. The transistor may also comprise a gate dielectric on a surface of the semiconductor channel between the first end and the second end of the semiconductor channel. In an embodiment, the gate dielectric is contacted by a word line that runs substantially perpendicular to the substrate surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lilak, Aaron Beaverton, US 53 156
Ma, Sean T Portland, US 72 170
Sharma, Abhishek Hillsboro, US 275 1676

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00