Cellulose fiber assembly and method for preparing the same, fibrillated cellulose fibers and method for preparing the same, and cellulose fiber composite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8771463
APP PUB NO 20130284387A1
SERIAL NO

13885741

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of the present invention is to provide a cellulose fiber assembly and a cellulose fiber composite, each having low coloration. The present invention is directed to a method for preparing a fibrillated cellulose fiber assembly, in which the cellulose fiber raw materials are subjected to a fibrillation treatment and a reduction treatment. The present invention provides a method for preparing a cellulose fiber assembly, comprising a fibrillation step of fibrillating cellulose fiber raw materials to obtain fibrillated cellulose fibers, an assembly preparation step of obtaining a cellulose fiber assembly using the fibrillated cellulose fibers, and a step of carrying out a reduction treatment. Further, the present invention provides a cellulose fiber composite comprising the prepared cellulose fiber assembly and a matrix material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OJI HOLDINGS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akai, Hideko Kanagawa, JP 13 208
Banzashi, Go Tokyo, JP 14 70
Noishiki, Yasutomo Tokyo, JP 14 97
Umemoto, Tomokazu Kanagawa, JP 9 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 8, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00