Motorized strength training apparatus with selectable force multiplication

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11925827
APP PUB NO 20230103725A1
SERIAL NO

17495584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exercise apparatus includes a first cable, a first motor configured to apply a tension to the first cable, a pair of pulleys, and a terminal. The first cable extends from the first motor, past the pair of pulleys, and to the terminal, and the terminal constrains a distal end of the first cable from retracting toward the first motor away from the terminal such that at least a minimum length of the first cable is maintained between the first motor and the terminal. The exercise apparatus also includes a first connection point between the pair of pulleys, wherein the first connection point is configured to selectively redirect the cable between the pair of pulley such that the first connection point experiences a first force corresponding to double the tension.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OXEFIT, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Neuhaus, Peter Pensacola Beach, US 19 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00