Tire conditioning optimization for a collection of mining vehicles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11187547
APP PUB NO 20200141745A1
SERIAL NO

16737696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method includes accessing a road network database to identify a tire cost for a plurality of edges in a mining road network, identifying least-cost paths between each of a plurality of nodes on the mining road network using the tire cost for each of the plurality of edges, the nodes including a loading area and a dumping area for a plurality of haul trucks, accessing a distributed objects database to identify constraints for the nodes on the mining road network, determining a production plan using the constraints for the nodes on the mining road network by maximizing a function of the form αf′(x)−βg′(x), where f′(x) is a normalized measure of productivity, g′(x) is a normalized measure of impact on tire conditioning, and α and β are nonnegative constants with α+β=1, subject to constraints on resource capacities and production requirements, with the material flow rates between each of the nodes on the mining road network specifying the production plan, determining a task assignment for each of the plurality of haul trucks using the production plan as guide, and transmitting the task assignment for each of the plurality of haul trucks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MODULAR MINING SYSTEMS INC3289 EAST HEMISPHERE LOOP TUCSON AS 85706

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rayco, Maria Brenda R Tucson, US 3 4
Van, Latum Lucas Tucson, US 17 239

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00