Compile device, compile method, and non-transitory computer readable medium for increasing a speed of a program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11829754
SERIAL NO

17299039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vector load instruction generating unit of a compile device generates an instruction to load a “first group of data units”, which is used as an element A[i] in iterative calculation processing, from a memory into a first vector register in a state of being packed in units of 1-word. Each data unit is (1/2)k word. The vector load instruction generating unit generates an instruction to load a second group of data units, which is used as an element [i+2k] into a second vector register. A vector shift double instruction generating unit generates an instruction to cause a part of a data string, which is obtained by shifting data of the first vector Register and the second register by (1/2)k word as a series of data string, to be stored in a third vector register in a state of being packed in units of 1-word.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEC CORPORATION7-1 SHIBA 5-CHOME MINATO-KU TOKYO 108-8001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masuda, Koichi Tokyo, JP 109 843

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00