Accelerating control procedures over BLE connection oriented services

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11582827
SERIAL NO

17370896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first BLUETOOTH device includes a transceiver configured to receive a control procedure packet from a second BLUETOOTH device during a BLUETOOTH connection event of a BLUETOOTH connection between the first BLUETOOTH device and the second BLUETOOTH device. The first BLUETOOTH device also includes a controller coupled to the transceiver and configured to set a more data (MD) bit of a response packet to the control procedure packet to a first value independent of whether the first BLUETOOTH device has more data to send to the second BLUETOOTH device. The first value corresponds to maintaining the BLUETOOTH connection event open. The transceiver is further configured to send the response packet to the second BLUETOOTH device during the BLUETOOTH connection event.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD M/S 3999 DALLAS TX 75243

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gersi, Lior Kfar Saba, IL 13 1
Machani, Yaniv Kiryat Ono, IL 2 1
Weizman, Yaniv Tel Aviv Jaffa, IL 20 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 14, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00