Channel configuration method and apparatus, power control method and apparatus, user equipment, base station and storage medium

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11895595
SERIAL NO

17460740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are channel configuration and power control methods and devices, a user equipment, a base station and storage mediums. The channel configuration method is configured to receive a second channel characteristic assumption of a control channel resource set configured by a second communication node; where the control channel resource set is formed by at least one of a first type of search space and a second type of search space; the second channel characteristic assumption is used for configuration of control channel resources in the second type of search space; and the control channel resource transmitted by the second communication node are received according to the second channel characteristic assumption.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ZTE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gao, Bo Guangdong, CN 498 2340
Jiang, Chuangxin Guangdong, CN 308 400
Lu, Zhaohua Guangdong, CN 587 1461
Wu, Hao Guangdong, CN 810 2470
Zhang, Shujuan Guangdong, CN 237 289

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 6, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00