High temperature corrosion resistant composite structure consisting of ruthenium and its alloys

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11390960
SERIAL NO

15718693

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure which is resistant to corrosion at high temperatures comprises a layer of ruthenium and/or ruthenium alloy and a layer of a refractory metal having a high strength at high temperatures, such as rhenium. Further, the structure may include a layer of ceramic such as zirconia or hafnia on the exposed face of the ruthenium layer. Alternative embodiments of the present invention include a catalyst formed from a low strength support structure with a first metal layer and a second ruthenium catalytic layer on top of the first metal layer. Another alternative embodiment of the present invention includes the formation of high purity ruthenium electrodes that are resistant to corrosion at high temperatures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PLASMA PROCESSES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McKechnie, Timothy N Gurley, US 8 194
Shchetkovskiy, Anatoliy Owens Cross Roads, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00