Tyre

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11142026
APP PUB NO 20190308465A1
SERIAL NO

16297761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tyre has a tread portion. The tread portion has a land region divided by a first edge and a second edge extending in a tyre circumferential direction. The land region is provided with a plurality of sipes each extending between the first edge and the second edge. The plurality of the sipes includes inclined sipes and bent sipes. Each of the bent sipes includes first inclined elements inclined in the first direction with respect to the tyre axial direction and a second inclined element inclined in a direction opposite to the first inclined elements with respect to the tyre axial direction. Each of the inclined sipes is configured to have a depth larger at a center portion thereof than at both end portions thereof. Each of the bent sipes is configured to have a depth smaller at a center portion thereof than at both end portions thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO RUBBER INDUSTRIES LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mishima, Mari Hyogo, JP 18 86

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00