Power converter having power stage circuits and an auxiliary module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11817781
SERIAL NO

17545141

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converter can include at least one first power stage circuit and a second power stage circuit, where each of the at least one first power stage circuit can include: at least one power switch, configured as a main power switch; a first magnetic element; a first energy storage element configured to be coupled to a first node of the first power stage circuit together with one adjacent power stage circuit, and to be charged or discharged through the adjacent power stage circuit; and an auxiliary module configured to ensure that a current flowing through the first magnetic element is not less than zero in a current discontinuous mode, where a first terminal of the second power stage circuit is coupled to an adjacent first power stage circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SILERGY SEMICONDUCTOR TECHNOLOGY (HANGZHOU) LTD

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Wang Hangzhou, CN 93 161
Zhao, Chen Hangzhou, CN 310 2044

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00