Tape-like optical fiber core, production method therefor, tape core-carrying connector, tape core-carrying optical fiber array, and optical wiring system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8811783
APP PUB NO 20050201697A1
SERIAL NO

10514813

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical fiber ribbon comprising a plurality of the coated optical fibers 2 arranged in plane and flame-retardant films 4a and 4b to integrate the coated optical fibers 2 is provided. The flame-retardant films 4a and 4b have an adhesive layer 5 formed thereon, and a plurality of the coated optical fibers 2 arranged in plane are integrated by the adhesive layer. The optical fiber ribbon 1 in this constitution uses flame-retardant films, wherein the ribbon thickness can be lowered and separation of single fiber can be facilitated by tearing off the film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO ELECTRIC INDUSTRIES, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiyoshi, Toshio Kanagawa, JP 1 13
Hosokawa, Takehiro Tochigi, JP 41 232
Ikada, Tsuyoshi Tochigi, JP 3 61
Nagao, Yoshiaki Kanagawa, JP 59 1136
Negishi, Kazuaki Kanagawa, JP 5 46
Sato, Kazuhiro Tochigi, JP 277 3742
Sugiyama, Hiroyasu Tochigi, JP 15 127
Tanaka, Keiichi Tochigi, JP 225 3912
Tanaka, Kousuke Tochigi, JP 42 261

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00