Method for preparing lead directly from lead-containing material by solid phase reaction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11519054
APP PUB NO 20200377971A1
SERIAL NO

16576765

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for preparing lead directly from a lead-containing material by a solid phase reaction, includes: step 1, adding the lead-containing material to be processed to the grinder, and adding a metal substance and water to the grinder, wherein an activity of the metal substance is larger than that of lead; the solid phase reaction between the lead-containing material and the metal substance is caused directly by the grinder through a mechanical force to obtain a reaction product; step 2, washing and filtering the reaction product to obtain the lead and a metal salt solution corresponding to the metal substance; step 3, performing a melt casting on the lead to obtain a crude lead, crystallizing the metal salt solution to obtain a metal salt corresponding to the metal substance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Chengyan Beijing, CN 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00