Control signaling transmission and demodulation method, system and terminal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10206203
APP PUB NO 20150049733A1
SERIAL NO

14386207

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present document discloses control signaling transmission and demodulation method, system and terminal. The control signaling transmission method includes: a base station transmitting control signaling using different transmission technologies on available transmission resources in the second control signaling transmission area in the same RB. With present document, by configuring a pilot frequency port and dividing the transmission resources in the second control signaling transmission area in the RB, the control signaling of a plurality of UEs using different transmission technologies can be transmitted on the available transmission resources in the same RB, thus fully utilizing the transmission resources in the RB, improving resource utilization rate, enhancing control signaling capacity, and supporting the control signaling of more users.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • XI'AN ZHONGXING NEW SOFTWARE CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yijian Shenzhen, CN 280 1368
Dai, Bo Shenzhen, CN 487 3407
Li, Yu Ngok Shenzhen, CN 279 991
Zuo, Zhisong Shenzhen, CN 82 474

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00