Energy system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9982918
SERIAL NO

15190130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heating medium supplied to an evaporator is used to heat lubricant oil in a screw compressor before the screw compressor starts up, and no additional heater for heating the lubricant oil in the screw compressor is required. When the screw compressor operates, the heating medium discharged from the evaporator after the evaporator is heated by the heating medium, is used to cool the lubricant oil. The lubricant oil heated by a lubricant oil heat exchanger is directly injected into a motor and a screw rotor so that introduction of a liquid refrigerant into a compressive chamber is reduced when the screw compressor starts up later. The lubricant oil introduced into the motor is discharged toward a lubricant oil storage portion before the screw compressor starts up so that the liquid refrigerant is prevented in advance from being introduced into the screw rotor when the screw compressor starts up.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOREA INSTITUTE OF ENERGY RESEARCH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baik, Young Jin Daejeon, KR 12 41
Cho, Jun Hyun Daejeon, KR 15 76
Lee, Gil Bong Daejeon, KR 15 58
Lee, Young Soo Daejeon, KR 42 97
Ra, Ho Sang Daejeon, KR 14 59
Shin, Hyung Ki Daejeon, KR 7 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00