Reversible fuel cell system architecture

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11923578
SERIAL NO

17785894

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of maintaining a thermal balance in a solid oxide reversible fuel cell system comprising a solid oxide reversible fuel cell, an air intake for providing air to the solid oxide reversible fuel cell, and a steam reformer fluidly coupled to the solid oxide fuel cell for providing fuel to the solid oxide reversible fuel cell. The method comprising operating the solid oxide reversible fuel cell system in a forward mode in which the steam former receives natural gas and produces hydrogen gas and carbon monoxide to be provided to the solid oxide reversible fuel cell, and operating the solid oxide reversible fuel cell system in a reverse mode in which the steam reformer receives hydrogen gas and carbon dioxide from the solid oxide reversible fuel cell and produces natural gas and water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CUMMINS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hickey, Darren B Columbus, US 6 303

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00