Transformer having assembled bobbins and voltage transformation module having the transformer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8669838
APP PUB NO 20140009251A1
SERIAL NO

13540930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a transformer having assembled bobbins and a voltage transformation module having the transformer. The transformer includes a base, bobbins, secondary windings and two magnetic cores. The base is provided with a penetration hole. The bobbins are disposed in the base and each has an annular groove, a hollow portion corresponding to the penetration hole, and protrusions formed on a surface of the bobbin. The protrusions form a gap between the two adjacent bobbins when the two adjacent bobbins are assembled with each other. The secondary windings are disposed between the bobbins and each has a through-hole corresponding to the hollow portion. The two magnetic cores penetrate the penetration hole of the base, the hollow portions of the bobbins, and the through-holes of the secondary windings to assemble them together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHICONY POWER TECHNOLOGY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsiao, Yung-Hung New Taipei, TW 25 56
Hsu, Hao-Te New Taipei, TW 17 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00