Control device for power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11948731
APP PUB NO 20220310318A1
SERIAL NO

17680990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device for a power conversion device using a multi-phase magnetic coupling reactor is provided. The multi-phase magnetic coupling reactor including: a first outer coil; a second outer coil; an inner coil; and a core. Directions of magnetic fluxes generated in the first outer coil, the second outer coil, and the inner coil are opposite to each other in any combination. The control device is configured to switch among a one-phase operation, a two-phase operation, and a three-phase operation. The control device is configured to select two phases of the first outer coil and the second outer coil in the two-phase operation, and the control device is configured to select one of the first outer coil and the second outer coil in the one-phase operation before the two-phase operation or a one-phase operation after the two-phase operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitamoto, Ryota Saitama, JP 30 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00