Airfoil assembly with composite rings and sealing shelf

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11549378
SERIAL NO

17832256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An airfoil assembly includes first and second fiber-reinforced composite airfoil rings each having inner and outer platform sections. A sealing shelf extends from a suction side wall of one of the first and second fiber-reinforced composite airfoil rings, and towards the pressure side wall of the other of the rings. A first seal is captured radially inwardly of the sealing shelves on outer platforms of each of the first and second fiber-reinforced composite airfoil rings. A second seal is captured inward of the sealing shelves on the inner platforms of each of the first and second fiber-reinforced composite rings to provide a seal between the respective first and second fiber-reinforced composite airfoil rings, and a captured internal component. A gas turbine engine is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RAYTHEON TECHNOLOGIES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sobanski, Jon E Glastonbury, US 46 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00