Battery including adhesion layer adhering positive electrode collector of first power generating element to negative electrode collector of second power generating element, battery manufacturing method, and battery manufacturing apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11024867
APP PUB NO 20190237796A1
SERIAL NO

16380927

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery is provided which includes a first power generating element, a second power generating element, and a first adhesion layer adhering the first power generating element to the second power generating element. A first positive electrode collector of the first power generating element and a second negative electrode collector of the second power generating element face each other with (i.e., via) the first adhesion layer. Between the first positive electrode collector and the second negative electrode collector, the first adhesion layer is disposed in a region forming a first positive electrode active material layer or a region forming a second negative electrode active material layer, whichever is smaller. The first positive electrode collector and the second negative electrode collector are not in contact with each other in a region in which the first positive electrode active material layer and the second negative electrode active material layer face each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honda, Kazuyoshi Osaka, JP 163 1242

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00