Photodetector having a tunable junction region doping profile configured to improve contact resistance performance

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10546971
APP PUB NO 20190214521A1
SERIAL NO

15867121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the invention are directed to a method of forming a semiconductor device. A non-limiting example of the method includes forming a semiconductor material that includes a first type of majority carrier. A doping enhancement layer is formed over a region of the semiconductor material, wherein the doping enhancement layer includes a first type of material. A dopant is accelerated sufficiently to drive the dopant through the doping enhancement layer into the region of the semiconductor material. Accelerating the dopant through the doping enhancement layer also drives some of the first type of material from the doping enhancement layer into the region of the semiconductor material. The dopant within the region and the first type of material within the region contribute to the region having a second type of majority carrier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
de, Souza Joel P Putam Valley, US 154 1018
Li, Ning White Plains, US 707 4065
Sadana, Devendra Pleasantville, US 65 806
Yao, Yao Poughkeepsie, US 64 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00