System for controlling network access of terminal based on tunnel and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11271777
APP PUB NO 20210328830A1
SERIAL NO

17359800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A node includes: a communication circuit; a processor operatively connected to the communication circuit; and a memory operatively connected to the processor and storing a target application and an access control application, wherein the memory stores instructions that when executed by the processor, cause the node to: detect a network access event of the target application to a destination network through the access control application, identify whether a tunnel corresponding to identification information of the target application and the destination network and authorized by an external server exists, transmit a data packet of the target application through the authorized tunnel using the communication circuit, when the authorized tunnel exists, and drop the data packet of the target application, when the authorized tunnel does not exist.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PRIBIT TECHNOLOGY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Joo Tae Seoul, KR 5 42
Kim, Young Rang Seoul, KR 14 33
Lee, Min Jae Seoul, KR 56 255
Song, Pil Ho Seoul, KR 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00